Snubbing Service
Snubbing Services
Texery provided the snubbing services across the major oil fields in China. It currently consists of three Hydra Rig 225k standalone snubbing units, three Caterpillar powerpacks, two sets of well control equipment, and auxiliary equipment, which can be used in wells at the pressure with up to 105MPa. The work string sized from 1-1/4” to 5-1/2. We have provided snubbing services for Jianghan oil field, Puguang oil field, Tarim oil field, and Huabei oilfield. The services included completion tool string tripping, well completion, perforation, fracturing, milling, wash over, and paraffin washing etc.
For oil and gas wells, the process of killing the well and bleeding off the wellhead won’t be necessary. This saves the costs of killing fluid, the equipment to pumping the killing fluids, protecting the formation.
2.The technology maintains formation pressure without using killing fluids. In a traditional well control method, killing fluid caused pollution and induced a negative effect to well data acquisition, well completion, well testing and ultimately reduced in the production loss. The physical properties of the oil and gas wells during the snubbing operation are less likely affected during the snubbing. However, the traditional killing fluids often result in blocking the perforation channels, other side effects include the induced mud cake leading to incorrect stratigraphic interpretation, expansion of water-sensitive minerals weakening the wellbore stability.
3.The technology minimizes the operation risks compared to the traditional well control method. The risk of blowout control is high often due to the unbalanced bottomhole pressure during pumping the killing fluids. The subsequent effect needs more expensive operation expenses.
4.Snubbing is considered to reduce the operational cost and improve the productivity index at long lateral horizontal wells. The cost is saved because no well killing is required. The damage induced by the killing fluid is noticeable, in addition to the killing fluid cost. Secondly, it takes a long time to stop injection and bleed off the pressure during pumping, this process could take two to three months until half year.
Texery has three sets of HRS-225 snubbing rig manufactured by National Oilwell Hydra Rig Company in USA. The HRS-225K snubbing unit is a standalone workover rig. This type of unit is easy to rig up and transport from one location to another. It is capable for using at different well operation and intervention. The basic parameters of HRS-225K snubbing unit are listed:
The powerpack is located on the ground or platform deck, which provides necessary hydraulic pressure for the operations of lifting machine, BOP stack, slips, rotary tables, winches (500 kg) and power tongs.
Advantages: the powerpack is composed of 5 sets of pumps and separately provide power, failure of one set of pump won’t interfere with other pumps; besides, the built-in accumulator bottle can also provide adequate power for shutting or opening BOPs, slips, hydraulic plug valves, etc. after powerpack emergency shutdown. In order to improve the operation efficiency and increase the service life expectancy, 3-level oil supply system is used in the main system to automatically adjust the volume of oil supply according to the actual load.
Work basket sits on the top of jack, and is the working platform for operators. The control panels is located within the operating platform to control jack, traveling and stationary slips, BOP stack, CB wenches, etc.
Advantages: it equipped with three sets of self-contained escape devices for escaping to the ground from 3 directions at emergency circumstances. Each operator may choose the nearest escape closed to him to quickly escape to the ground.
The tripping of pipe string may be configured through 4 hydraulic cylinders, 2 leg mode or 4 leg mode It depends on the well conditions during operation. The telescoping tubing guide is located in the through-hole of jack for providing the centralizing and guiding so as to prevent pipe buckling.
Advantages: switching between 4 legs and any 2 legs.
Control panel is consisted of three independent parts, wherein one part is the main operation panel for controlling jack, slips, etc., the second one is auxiliary operation panel used to control strippers , equalize loop, bleed off lines and 1# safety BOP etc., and the last one is CB wench control panel used to control the dual counter balance winch.
Advantages: each panel is independent and the operation requires three operators.
The BOP stack is the core equipment for operation under pressure; currently, we have 14 BOPs in total, stripper BOPs, safety BOPs, shear / fully-sealed BOPs, slip BOPs and annular BOPs. These can simultaneous be used on multiple wells. These include 10 Cameron type U single ram BOPs (7-1/16”, 105 Mpa), 2 shear ram BOPs and 2 annular BOPs (7-1/16”, 35 Mpa).
The stripper BOP stack is composed of stripper BOPs, HCRs, manually operated plug valves, choke valves, riser and guiding BOP, etc.
Advantages: it may be flexibly assembled into different configurations to meet the operational needs. The distance between 2 stripper BOPs needs to be long enough to avoid the coupling stucking at the BOP ram.
More than 110 wells
have been completed since 2012. DOT serviced for EOG Recourses, Fuling shale
gas field, Puguang gas field, etc.
Type of services: Replacing work string, well completion (chrome tubing),
fracturing operation, perforation, well workover(including sand washing, well
washing, fishing, milling, etc.).